Home > Product > 6300kVA Ferro-alloy Refining Furnace
  • 6300kVA Ferro-alloy Refining Furnace
6300kVA Ferro-alloy Refining Furnace

6300kVA Ferro-alloy Refining Furnace

1. Furnace working conditions
1.1 Environment
1.1.1 The altitude is less than 1500m;
1.1.2 Environment temperature: -20-45℃;
1.1.3 Monthly average maximum humidity is less than 90% during rainy season;
1.1.4 No electric dust, detonating gas and aggressive gas;
1.1.5 No obvious vibration and shaking.
1.2 Power supply
High tension      AC 10KV ± 10%
Low tension       AC 415/230V ± 10%
Frequency       50Hz ± 2%
Control voltage      AC 230V
Electromagnetic valve    DC 24V
3. Main technical parameters
SN Description Unit Data Remark
1 Furnace type  AC EAF 
2 Nominal capacity T 12 
3 Diameter of shell mm Ф4800 
4 Furnace transformer   
 Rated power kVA 6300 Overload 20%
 Primary voltage kV 10 
 Secondary voltage V 312-282-170 
 Secondary current A 12899 
 Frequency Hz  50 
 Cooling mode  OFWF 
5 Electrode lifting system   
 Electrode diameter mm 400 NP graphite
 Diameter of pit circle mm 1250 
 Ascending speed m/min 6/9 Auto/man
 Descending speed m/min 4.5/6 Auto/man
6 Tapping mode  Spout 
7 Tilting angle ° 45 
 Tilting speed º/s 1 
8 Hydraulic system   
 Working pressure MPa 12 
 Medium  46# Mineral oil
9 Cooling water system   
 Inlet pressure MPa 0.4 
 Inlet temperature ℃ ≤35 
 Outlet temperature ℃ ≤55 
 Cooling water flow m3/h 150 
3. Scope of Supply
SN Item Qty Remark
1 Furnace body 1 set 
2 Tilting mechanism 1 set 
3 Water-cooled roof and charging hopper 1 set 
4 Conductive arms 1 set 
5 Electrode lifting mechanism 1 set 
6 Cooling water distributor 1 set 
7 Hydraulic power pack 1 set Proportional valve make: Parker
8 Short net 1 set 
9 L.V. Control system 1 set 
10 PLC control system & HMI 1 set Siemens S7-300
11 6300kVA furnace transformer c/w hydro-oil cooler 1 set 
12 10kV H.V. switchboard 1 set GG-1A
4. Quotation conditions
4.1 All present and/or future taxes and duties related to the execution of this Contract, income tax levied on the Seller’s personnel, tax on foreign contractor’s business operated in Pakistan in accordance with existing laws, shall be borne by the Buyer;

4.2 The Seller will dispatch engineers(Includes mechanical, electrical, PLC, hydraulic, etc) to supervise furnace installation and commissioning. Round trip air ticket, local traffic transportation and accommodation cost are borne by the Buyer. The Supervision cost is $300USD for 1 person per day;

CONTACT US

VILLE INDUSTRY CO.,LTD.

Contact:Green Hsu

Mobile: 008613867838839

Email: Green@cnville.com

          Jennifer@cnville.com

Tel: 0086 574 27960025

       0086 574 27960028

Head office Add: FL 6, NO.C12 BUILDING, LANE 299 GUANGHUA RD, NINGBO R&D PARK,NINGBO HI-TECH ZONE,CHINA, 315040

Manufacture Add:NO 172 DAQING ROAD SHIPU XIANGSHAN NINGBO ZHEJIANG CHINA 

Scan the qr code Close
the qr code